Since Saturday, December 20th, a 400 watt wind turbine produces electricity for the meadow. This windmill was built during the climate camp in 2015 by a group of people, and has now found its way to the occupation.
Instructions on how to clone it will be published here as soon as possible.
Thanks a lot to all of you for your commitment during the climate-camp.
Energy transition remains handwork!